Type: Infrastructure
Client: GUPC
Year: 2013-2016
Supply of qualified labor for the construction of various structures.
We performed the pouring of over 80,000 m3 of concrete, the installation of over 60,000 m2 of formwork, the repair and finishing of over 200,000 m2 of exposed concrete, the formwork and pouring of over 6,000 cubic meters of concrete to protect the over 21 kilometers of installed pipeline for beam ducts, among others.