Supply of qualified labor for constructing the concrete structure of the controlled spillway, the free spillway, and the retaining walls of the plant. More than 50,000 cubic meters of concrete poured and 60,000 cubic meters of roller-compacted concrete (CCR).
Located in Bajo Frio, Chiriqui.